Roberto Vincenzo Florio Engineering Studio

Rainwater network construction works | Vieste

Location: Vieste, FG
Total surface area: Bacino Pantanello, Pizzomunno
Year: Ottobre, 2023
Engineer: Roberto Vincenzo Florio

PROJECT DETAILS

Construction, expansion and adaptation works of the rainwater network.

Summary of analysis of the existing and project survey status

A project was carried out aimed at expanding the network for the collection of rainwater in the Municipality of Vieste, precisely in the hydrogeological basins of Pantanello and Pizzomunno, also providing for the adaptation of the network through the construction of 4 systems for the collection of rainwater. first rain water and subsequent storage.

The first rain and storage plants were located with a high level of purification, positioning them not only in front of the receiving basin but also in densely urbanized areas.

Gli impianti di prima pioggia e stoccaggio, sono stati ubicati prevedendo un elevato livello di depurazione, posizionandoli oltre che davanti al bacino recettore anche in aree densamente urbanizzate.