Purification plant | Peschici

Location: Peschici, FG
Total surface area: Municipality of Peschici
Year: 2023
Engineer: Roberto Vincenzo Florio

PROJECT DETAILS

Economic technical feasibility project

Technical and economic feasibility project of the new wastewater purification plant and sewer collectors serving the Municipality of Peschici (FG) and implementation of the urban sewerage network.

Summary of analysis of the existing relief state and design choices

The technical-economic feasibility project of the wastewater purification plant, serving the municipality of Peschici, became necessary due to various problems that the current plant presents. 
For this purpose, various hypotheses were envisaged for the search for the new site where to locate the new plant and after a series of technical/environmental assessments it was decided to locate the plant approximately 5 km from the town, also laying the foundations for a new and future urban planning of the Municipality of Peschici.
In the technical feasibility study, the implementation of the sewerage network within the town was also envisaged, as well as a modern purification technology, contemplating the refinement of waste water and the reduction of odorous emissions.

Impianto_dep2
Impianto_dep3x
Imp_dep